- Status Assessment
- Type Re-application
- Pre-PASC consultation Not applicable
- Pre-MSAC consultation Open
- Outcome Pending
Application details
Applicant
Reason for application
New Medicare Benefits Schedule items.
Service or technology in this application
Level 2 polysomnography is the measurement of sleep in the same way as polysomnography undertaken in an overnight sleep study in a sleep laboratory. However, the study is undertaken at home or another location that is not a sleep laboratory and there is not continuous monitoring of the signals by a sleep technician as occurs in laboratory sleep study. Instead, signals are recorded overnight and data is downloaded and analysed after the sleep study.
Type: Investigative technology
Medical condition this application addresses
Sleep disordered breathing is common in children, with obstructive sleep apnoea the most prevalent. Obstructive sleep apnoea is a partial or complete closing of the airway during sleep that results in lower oxygen levels within the body, snoring, daytime sleepiness and other health problems. Potential causes of sleep disordered breathing in children include enlarged adenoids and tonsils, obesity, reduced muscle tone of the airway and abnormalities of airway shape or size.
Previous applications
Application documents
Application summary
PICO set
We aim to provide documents in an accessible format. If you're having problems using a document with your accessibility tools, please contact us for help.
Consultation survey and deadlines
The following consultation deadlines apply:
- Pre-PASC consultation deadline: Bypassing PASC
- Pre-MSAC consultation deadline: Friday 13 June 2025 11:59 pm AEST
For other ways to provide input, see how to have your say.
We welcome input from everyone. We are especially keen to hear from those with lived experience of the health condition, service or technology the applications are addressing.
Find out more about consultation.
Meetings to consider this application
This application will be considered at the following meetings:
- PASC meeting: Bypassing PASC
- ESC meeting: Bypassing ESC
- MSAC meeting: 31 July - 1 August 2025
Find out more about our meetings.
Outcome details
The outcome of this application is pending.
More information
Find out more about: